loader

COOLING ON CANOPIES

Cooling Treatment On Fabric Canopies.



Preparation For Cool Roof Coating:
Features:

  • Identify the roof area to be coated for Cool Roofs.
  • Check for the weather forecast for the atmosphere. Sky should be clear free from dust storm and rains.
  • Check for the safety measures to be taken while coating the roof.
  • Inspect and repair the roof for any repairs, check for any blistering, loosening of screws, and drainage issues in the roof.
  • Make arrangements of electricity points, voltage requirement for the airless gun; proper earthing, other application tools (broom, mops, cleaning rugs, proper storage (Cool & dry space – away from direct sunlight) space for coating material.

Note: Applicators Should Wear Goggles, Full Sleeves Cotton Wear To Protect Themselves From Direct Sunlight.

  • Installation of the Cool Roof Coatings.
  • Dry Clean the surface properly for dry dust collected/ any dry debris on roof.

Note: Surface Preparation Is The Most Imp Step In Any Roof Application.

  • Wash the Surface with water using Jet pressure.
  • Remove algae and fungus if any.
  • Wait for 3 to 4 hours to let the surface dry completely.
  • Apply 1st coat of Mx Cool Top

Note: Always Stir The Emulsion Of Mx Cool Top Before Using. (For Spray Application If Consistency Needs To Be Adjusted, It Can Be Adjusted By Mixing Distill Water Up To 5% To Make It Suitable For Spray According To The Nozzle Of Spray Used.)

  • liWait for 3 to 4 hour for complete drying of the surface.
  • If during the process of drying, dusts accumulate on the painted roof, again remove the dust by dry mopping. Note: Pl be careful that dust marks are not there on lithe first coated surface.
  • liApply 2nd coat of Mx Cool Top. Note: Applicators should wear goggles, clean socks while applying second coat of Mx Cool Top.
  • liLet the surface completely dry for 3-4 hrs.
  • liRepeat step 7.
  • liApply layer of TranSeal as the last step.
  • liNote:Pl be careful, atmosphere is not dusty during the application of Tran Seal application.
  • liLet the surface dry and completely cure for 3 – 4 hrs.

Get In Touch